Schedule load in MDM


Forum|alt.badge.img+3
  • Data Pioneer L2
  • 11 replies

I have MDM setup and records are loaded using a Full Laod configuration. I need to create a load such that all the records that were added into the source are moved into to MDM hub on a daily basis. The approach being used is to identify all the records updated today and load them into MDM. Can you please suggest if I need to create a Delta Load for this or Full Load works. Also, I need to schedule a run of the load file on daily basis.How can I do it?

Best answer by AKislyakov

Hi @Kundan,

A Full Load can work if you're transferring all records from the source to the MDM. In that case, the Full Load compares source records with their copies on the MDM and determines each record's status (unchanged/updated/inserted/deleted), then processes them accordingly.

If you want to minimize the amount of data transferred, you can create a Delta Load. You can extract newly updated/inserted/deleted records from the source using timestamps or audit logs and transfer only those records to the MDM, providing their change type so the MDM can process them correctly.

As for scheduling such loads you can use the Scheduler to schedule a workflow that performs an MDM Load

View original
Did this topic help you find an answer to your question?

6 replies

Forum|alt.badge.img+2
  • Ataccamer
  • 146 replies
  • Answer
  • August 13, 2024

Hi @Kundan,

A Full Load can work if you're transferring all records from the source to the MDM. In that case, the Full Load compares source records with their copies on the MDM and determines each record's status (unchanged/updated/inserted/deleted), then processes them accordingly.

If you want to minimize the amount of data transferred, you can create a Delta Load. You can extract newly updated/inserted/deleted records from the source using timestamps or audit logs and transfer only those records to the MDM, providing their change type so the MDM can process them correctly.

As for scheduling such loads you can use the Scheduler to schedule a workflow that performs an MDM Load


  • Star Blazer L1
  • 40 replies
  • January 21, 2025

Hi Team,
Can anyone please tell if a mdm job can be scheduled for a particular timezone? What timezone does the scheduler generally works on?
@Cansu Please let me know if this should be a separate question. Added it here as it seems related


Forum|alt.badge.img+2
  • Ataccamer
  • 146 replies
  • January 22, 2025

@aish_TF Scheduler uses timezone of the server MDM runs on


  • Star Blazer L1
  • 40 replies
  • January 22, 2025

@AKislyakov 
Thank you.
Will raising a ticket help me know where the host server located?

Regards,
Aishwarya


Forum|alt.badge.img+2
  • Ataccamer
  • 146 replies
  • January 22, 2025

Usually, it is available in Java Properties section of Admin Center

 

 


  • Star Blazer L1
  • 40 replies
  • January 27, 2025

@AKislyakov 
This does not seem to be returning the timezone of where the server is located/the timezone I should use/consider while scheduling. For now, a coalleague helped me know our timezone. If I find anything that helps find the timezone for scheduling, I’ll update here